Schedule and Monitor Backups¶
Schedules are saved with the job. On Create Backup Job, the section Schedule and retention offers four choices. Daily, weekly, and cron times use the server's local clock. The scheduler checks about every 30 seconds.
Include the schedule when you create the job. The job form is not offered again after the job is saved. Read Backup Jobs and History for the result.
Create a schedule¶
| Choice | Fields that apply | When it runs |
|---|---|---|
| Manual | None | Only when you click Backup now. |
| Daily | Hour (0–23) and Minute (0–59) |
Every day at that local time. The form starts at hour 2 and minute 0. |
| Weekly | Weekday, Hour, and Minute | The selected weekday at that local time. Weekday starts at Sunday. |
| Cron | Cron | A five-field expression: minute, hour, day of month, month, weekday. The helper example is 0 2 * * *. |
A cron field accepts *, a number, a list (1,15), a range (1-5), and a step (*/15). Month names jan through dec and weekday names sun through sat are accepted. Weekday 0 and 7 are Sunday. An expression that is not five valid fields is rejected with cron must be five fields: minute hour day month weekday or invalid cron expression.
Successful backups to keep is keep_last. The value is from 1 to 100. The form starts at 30. After a new backup succeeds, older successful backups beyond that count are deleted from the destination. The history row remains. A failed backup does not remove the newest successful one.
Click Create job. An enabled daily, weekly, or cron job shows the next run on Backup Jobs and in the Next Scheduled Backup card. The card uses the server's local time. The tooltip on the time is the UTC instant.
Enable and disable¶
On the job row, open the actions menu.
- Disable stops later scheduled runs and clears the next run. A backup that has already started keeps going. Backup now still runs a disabled job.
- Enable schedules the next future time only. A run that was missed while the job was disabled is not started.
Job status shows Enabled or Disabled.
Delete opens a confirmation page. Delete job removes the job and its future schedule. Backup history and existing backup files are kept. If a backup is running, the page says This job has a backup running. Wait for it to finish or cancel it before deleting.
Run a backup manually¶
Click Backup now on the job row. This starts a run even when the job is disabled. If that job is already running, a second copy is not started. The overlapping run is recorded as Skipped.
Cancel appears on the job row, and on the run page, while the status is Running. Cancellation stops that run, including an upload still in progress, and records the run as Cancelled.
Read the history¶
Click History. The page subtitle is Review backup runs, sizes, and verification. The table lists recent runs, up to 100.
| Column | What it shows |
|---|---|
| Job | Name at the time the run started. The link opens the run. The name remains after the job is deleted. |
| Type | File System or PostgreSQL. |
| When | Start time, in UTC. |
| Result | Running, Successful, Failed, Cancelled, Interrupted, or Skipped. |
| Destination | Destination name copied when the run started. |
| Size | Compressed size of the archives for that run. |
| Verification | Pending, Verified, or Failed. A dash means no verification state is stored. |
| Error | The run error. A retention problem is prefixed with Retention:. |
Interrupted means the service restarted while the run was still marked running. Staging files from that run are removed.
Open a run for Backup status. The page shows Status, Trigger (Manual or Schedule), Verification, Started, and Finished. A failed run shows the error under the facts. A retention problem is labeled Retention:.
The Files table lists each archive, the database name for a PostgreSQL dump, the compressed size, and the SHA-256. Download is shown for a browser-download file that is still on the server. A remote file shows the remote location. A Google Cloud Storage object can also show the bucket, generation, CRC32C, and the time the object was confirmed. Deleted means retention removed that file. The history row stays.
The Backup Jobs page also summarizes Backup Jobs, Last Successful Backup, Storage Available on the backup volume, and Next Scheduled Backup.
What verification covers¶
Verified means the checks for that archive completed:
- A file-system archive was opened again and every tar entry was read.
- A PostgreSQL dump matched its gzip checksum and contained a
pg_dumpheader. - An S3 or SFTP object matched the archive size and SHA-256.
- A Google Cloud Storage object matched the archive size and CRC32C.
A matching checksum confirms that the stored object matches the bytes that were sent. It does not open a remote archive again, and it does not mean the data can be recovered later. Test a restore with your own tools. AcuGIS Backup does not restore backups. See Security.